Project Challenges

  • The site’s proximity to traffic on Alameda and Flower streets required constant traffic control.
  • Nearby storm drains necessitated continuous cleaning of the area.
  • The client required adherence to a tight schedule for timely completion.
  • The City of Burbank required recycling of all materials and recycling reports.

Equipment Used

  • Flat Saws
  • Bobcats
  • Backhoes
  • Hydraulic Breakers
  • Roll-off bins (provided by our sister company and licensed waste hauler, Metropolis Disposal)
  • Low Side Semis

Key Outcomes

  • All work was performed safely during regular business hours, despite the site being surrounded by large businesses like Home Depot.
  • The project was completed on schedule in accordance with AB 341 requirements, allowing the client to begin the next phase of construction on time.