Nippon Express USA Demolition Project
General Contractor
KCS West
Site Location
2233 East Grand Ave.
El Segundo, CA 90245
Project Phases
This demolition project benefited from the valuable experience of our planning team, foreman, and crew.
We completed the project in three phases, working alongside the site owner’s operations and making safety our top priority.
Phase 1
During the first phase of demolition, we were required to saw cut and remove concrete from a wall for new window openings. Since the building was occupied, we used a Gradall and forklift to lift the wall sections instead of breaking with equipment which would cause excessive vibration and noise to employees working inside.
Phase 2
During the second phase, Intracut demolished the old office area which consisted of partitions, ceilings, and wood mezzanine floor. Before we began, KCS West installed a temporary wood barrier to separate the new office from the old office area for dust control. We used hand work at critical areas to protect the new walls. The wood mezzanine was removed using a backhoe and bobcat in a controlled environment to minimize dust in the existing offices.
Phase 3
During the third and final phase of demolition, the client – Nippon Express USA, Los Angeles Branch Air Service Division – wanted to create new loading docks for their business expansion while the old loading docks were still in operation. To achieve this, a section of the warehouse had to be completely demolished. Before beginning demolition, shoring scaffolds were installed to hold up the existing roof structure. Then, Intracut saw cut and broke the slabs for new footings and walls to enclose the area. These walls also served as dust and noise barriers for the occupied areas.
Finally, we were able to isolate the roof with hand crews and separate the structure. We then used our heavy equipment excavator to pull the roof down and break the concrete tilt-up walls without disturbing any activity inside the building.