Parking Lot Core Drilling Project
General Contractor
ClearMarket Automotive
Site Location
2025 S. Figueroa
Los Angeles, CA 90007
Project Objective
To prepare a Los Angeles parking lot area for the construction of a rotating turntable for automotive imaging and inspection.
Scope of Work
Intracut completed core drilling through asphalt and auguring through dirt to prepare for pouring of columns using column tubing which was 3′ deep. The holes were 14-36″ in diameter. We completed 39 cores.
Equipment Used
- Specially configured bobcats with mounted coring machine
- Bobcat mounted augers
Special Considerations
Modifying equipment to suit the job and terrain.
Client Testimonial
“I cannot say enough about Intracut’s performance on this complicated job. I would recommend them to anyone and will call them for the next project.”
~ Angel Rubio