Client
Carmax
Construction Company
W. E. O’Neil
Construction Site Address
1000 South Flower Ave
Burbank, CA 91502
Cost
$83,000
Services
Concrete Cutting, Concrete Breaking and Removal, Hard Demolition
Completion Date
August 2006
The site’s proximity to traffic on Alameda and Flower required constant traffic control.
Nearby storm drains necessitated continuous cleaning of the area. The City of Burbank required recycling of all materials and recycling reports. And the client required adherence to a tight schedule for timely completion.
To complete this project we used the following equipment:
- Flat Saws
- Bobcats
- Backhoes
- Hydraulic Breakers
- Roll Off Bins provided by our sister company and Burbank licensed waste hauler Metropolis Disposal
- Low Side Semis
Even though the job was surrounded by several large businesses like Home Depot, we performed all of the work during regular hours safely.
The job was completed in the time schedule allotted and our customer was able to start the next phase of construction on time.