Client
Carmax

Construction Company
W. E. O’Neil

Construction Site Address
1000 South Flower Ave
Burbank, CA 91502

Cost
$83,000

Services
Concrete Cutting, Concrete Breaking and Removal, Hard Demolition

Completion Date
August 2006

carmax concrete cutting project
carmax concrete cutting project
carmax concrete cutting project
carmax concrete cutting project
carmax concrete cutting project
carmax-slide01-min
carmax-slide02-min
carmax-slide03-min
carmax-slide04-min
carmax-slide05-min
previous arrow
next arrow
carmax-slide01-min
carmax-slide02-min
carmax-slide03-min
carmax-slide04-min
carmax-slide05-min
previous arrow
next arrow

The site’s proximity to traffic on Alameda and Flower required constant traffic control.

Nearby storm drains necessitated continuous cleaning of the area. The City of Burbank required recycling of all materials and recycling reports. And the client required adherence to a tight schedule for timely completion.

To complete this project we used the following equipment:

  • Flat Saws
  • Bobcats
  • Backhoes
  • Hydraulic Breakers
  • Roll Off Bins provided by our sister company and Burbank licensed waste hauler Metropolis Disposal
  • Low Side Semis

Even though the job was surrounded by several large businesses like Home Depot, we performed all of the work during regular hours safely.

The job was completed in the time schedule allotted and our customer was able to start the next phase of construction on time.